Hydrant Main

Client: Hartle/Jaguar Cars

Package Value: £300,000

Programme: 20 weeks

Commentary:

May Contractors as Sub-Contractor to Hartle BMS assisted in the completion of a 300mm Hydrant Main around the existing Jaguar site located at Castle Bromwich. The Hydrant Main required a trench of 600mm width and a depth of 1.2m with a foamed concrete backfill.

  • 300mm Hydrant Main (1350m)
  • 2.0x2.0m Chambers (10 nr.)

The works were completed within a ‘live' site environment and required consistent traffic management measures and close liaison with factory officials throughout.

 

Press Pit, Shrewsbury

Client: Stadco/Anglo Holt

Package Value: £550,000

Programme:

Commentary:

May Contractors as Sub-Contractor to Anglo Holt Construction completed the structural works to a large pit to house five large presses for Stadco Ltd.

  • 60m Pit (6m depth)
  • 400mm soffit
  • Installation of new crane rails
  • Overlay to existing concrete floor (1000m2)

This contract required

 

 